Tasova HEPP
This project is a prime example of the small type hydroelectric power plants that are being built in Turkey.
The total generation capacity of this plant is 2x1 MVA.
We have successfully procured, manufactured and installed the electrical balance of the plant and the plant is operational since 2008.
SCOPE:
1. Design of the electrical, control and SCADA systems of the plant.
2. Procurement and installation of the 34,5 kV generator and measuring switchgear.
3. Installation of two 1 MVA step up transformers.
4. Procurement and installation of the neutral grounding panels of the 34,5 kV step up transformers.
5. Design, production and installation of the relay and control panels.
6. Procurement and installation of the SCADA system.
7. Installation of the generator and turbine control panels.
8. Installation of the station service transformer and diesel generator.
9. Design, production and installation of the DC panels.
10. Design, production and installation of the station service panels.
11. Installation of the 6,3 kV generator lead cubicles.
12. Design, production and installation of the cable trays.
13. Design, procurement and installation of the electrical and control cables.
14. Making the necessary electrical and remote control connections at the head pond and water intake.
15. Making the necessary electrical connections of the turbine and the generator for the operational testing of the units
16. Testing and commissioning of the plant.
- Contract:
- Hydroelectric Power Plants
- Place:
- Amasya, TURKEY
- Design Year:
- 2008
- Project Status:
- Completed
CONTRACTS
Railway Systems