Boyabat HEPP

Boyabat HEPP is one of the most important power plant projects of Turkey and it is being built in Sinop.

The plant has a total generation power of 3x204 MVA (612 MVA Total) and when finished it will be the 6th biggest HEPP of Turkey.

Our company is currently the consultant of electromechanical works for the construction firm Dogus Insaat A.S.

Under our contract with Dogus we have revised and updated the tender documents and tender drawings of the following;
* Turbine
* Generator
* Transformer
* 380 kV Switchyard
* 380 kV Transmission Line and cables
* Electrical Equipment
* Control, PLC and SCADA systems
* Communication Systems

Our company will work as the consultant of the electromechanical works until the plant is operational.

The grounding calculations, projects and installation of the plant is under our scope.

We have also designed, manufactured and installed the site electrical equipment which has a total power of 24.670 kVA.
Under this seperate contract we have procured, manufactured and installed the following,
* 23 transformer substations between 400-2.500kVA.
* 58 34.5 kV Medium Voltage cubicles
* 19.600m 34.5kV Overhead Transmission line
* 27.700m 34.5kV Medium Voltage Cabling

Boyabat HEPP - Picture from the construction phase

CONTRACTS

1276178421_Genel
Airports and Airfield Navigational Aids

Our company has finished a contract to upgrade an international airport that is used by 7.5...

Please click for more information.

Tags